All current LPS projects are on: OST/DPC v4.0.0.405  ·  Quick Bid v4.99.05.16
Next update communicated 1 week in advance · Updates are required per service agreement to maintain weekly DPC workflow
⚙ Self-Perform Labor Tracking · Powered by On Center Software's Digital Production Control (DPC)

Control Your Self-Perform Labor
Every Week

Every week you don't track is a week you can't recover.

LPS runs On Center DPC for self-performing contractors — aligning estimate structure, field reporting, and payroll into one weekly labor tracking system so ownership and PMs always know where the job stands.

What is DPC?

Digital Production Control (DPC) is On Center Software's field-to-office labor tracking platform. Unlike timecards that only capture hours, DPC puts the actual estimated takeoff in front of your foreman on a laptop — every week. They select the phase codes for work completed that week directly from the estimate. They learn the scope. They learn to spot change order items. They report actual production accurately. Gain confidence that you know the health of your projects. See your foremen appreciate a tool that gives them the means to report actual performance accurately to the office. Find your strengths and weaknesses objectively — and we will help you get there.

Most contractors who use On Center's estimating platform know DPC exists — but never had someone to run it consistently. LPS manages the complete weekly workflow — estimate alignment, field reporting, and labor analysis — so DPC becomes a weekly decision-making system, not just software you're paying for.

We align your estimate, field reporting, and payroll into the same phase code structure — so every hour is tracked where it actually belongs.

We'll walk you through DPC on a realistic self-perform project.

Best engaged before field labor begins — when phase codes, estimate structure, and reporting workflow can be aligned from day one.

Most labor overruns are not a single event. They are weeks of small misses that nobody caught in time.

By the time it shows up in billing, it's already gone.

Built from managing live self-perform projects — not from training or theory.

Built for drywall, framing, interiors, and self-perform operations.

Weekly
Labor Visibility
20+
Years in Self-Perform
Estimate
Aligned Tracking
LPS
Weekly Executive Summary
Week 18 of 42 · Commercial Interior
Overall Completion
43%
11,783 of 27,400 est. hrs earned
Base Bid Position
+2,840 hrs
Ahead on all active base bid work
Projected at Close
+3,120 hrs
If current pace holds to completion
Projected Savings
$262k
+3,120 hrs × $84.00 blended rate
▲ Position gained +184 hrs this week
Prior week: +2,656 hrs
Active Phase Codes — This Week
Drywall Hang — Low
+520
Drywall Hang — High
+288
Ceiling Grid
−126 △
Ceiling Grid trending over — Zone B/C flagged for PM review. Drywall Hang Low and High tracking ahead. Net position +2,840 hrs.
Core Engagement Service: Uses your existing OST & QB estimate — add a DPC Foreman license on a Windows laptop per foreman per active project.

Estimate Conversion Service: LPS recreates your estimate in OST & QB on our end — you only need a DPC Foreman license and Windows field machine per project.

LPS holds all PM licenses and handles setup, processing, and reporting. Contact us to discuss which service fits your operation.

The Problem We Solve

Labor Losses Are Recoverable —
If You Catch Them in Time

Most contractors find out they're over labor budget at month-end billing. By then, the work is done and the margin is gone. DPC shows you exactly where you stand — every week, by phase code — while you can still do something about it.

Most projects recover the full cost of LPS with less than 1% labor improvement.

Weekly Labor Position

Know where you stand on every phase code — hours ahead, hours behind, and where the job is trending. Updated weekly, not at closeout.

Field Data Tied to the Estimate

Your foreman opens DPC on a Windows laptop, enters percent complete for work in place using the actual takeoff in front of him, logs hours for each crew member tied to those phase code conditions, and submits everything through Project Express — weekly, within DPC. No paper timecards. No emailed hours. No arbitrary phase code selection. The estimate drives the reporting.

Early Warning, Not Month-End Surprises

Each report flags high-risk phase codes, identifies what is performing well, and projects where the job will land. Ownership, PMs, and field leadership all see the same data — every week, not at closeout.

PM Hours Back on the Job

LPS takes over weekly timecard collection, phase code reconciliation, and report delivery — 5 to 8 hours per week your PM gets back to focus on trade coordination and schedule management where they create more value.

DPC & Accounting Telling the Same Story

At setup, LPS aligns DPC phase codes with your accounting budget labor items. If accounting isn't currently tracking labor by phase code, we consult new codes and deliver a full phase code report before the first hour is entered. When DPC and accounting don't match, ownership sees two different pictures of project health. We close that gap before kickoff.

Transparency That Builds Trust in the Field

DPC gives your foreman the same labor picture ownership sees — real data, updated weekly. On well-estimated projects, that transparency gives the foreman breathing room to know exactly where he stands without guessing. No end-of-job surprises. No office politics around whether the job performed. The numbers are objective, visible to everyone, and tied directly to the estimate he's building against.

Best Fit For
  • Self-performing GCs and specialty subcontractors
  • Drywall, framing, interiors, and finish contractors
  • Self-performing contractors ready to activate On Center's DPC platform
  • Operations managing $1M–$10M+ in annual self-perform labor
  • Companies that typically find out labor is off budget after it's already too late to correct
  • Projects where phase code tracking can be established before field work begins
Probably Not a Fit
  • Companies without formal labor estimates
  • Small one-off crews with no phase code structure
  • Teams unwilling to submit weekly field data
  • Operations not using On Center software (unless aligning first)
Before We Start

What You Need
Before We Activate

DPC activation requires four things. If you have them, we can be live in under a week. If you don't have all four, we have a path to get there.

  • On-Screen Takeoff (OST) in place — your estimating department uses OST to measure from digital plans
  • Quick Bid estimate in Interactive mode — labor hours must be assigned per phase code in QB Interactive before DPC can activate
  • DPC Foreman license on a Windows machine — LPS holds PM licenses; your foreman needs a Foreman license to submit via Project Express
  • A foreman willing to submit weekly field data — LPS walks alongside your foreman virtually through the first four end-of-week DPC updates. Most foremen have the workflow down well within 2–3 weeks of reporting with us.

Don't have all four yet? Ask about DPC Readiness & Estimate Conversion — LPS can convert your existing estimate into the correct format and get you activation-ready. Contact us to assess your setup.

Delivered Every Week

What You Receive
Every Week

Visibility only matters if it comes early enough to act. Every report is structured for quick review — so your PM and ownership know exactly where to act before another week passes.

  • Budget vs. actual by phase code — tied directly to the estimate
  • Hours gained or lost — this week and cumulative
  • End-of-project labor projection at current pace — before it's locked in
  • High-risk phase codes flagged for attention
  • Top-performing phase codes highlighted
  • Weekly timecard payroll report — tied to estimate phase codes so payroll entries are clean and traceable
How It Works

Up and Running in Days

01

Setup & Activation

LPS audits your OST/QB estimate, activates DPC on our PM license, configures all phase codes and budgets, and onboards your foreman. If your estimate needs alignment first, we handle that before activation.

02

Weekly Field Input

Your foreman submits percent complete and timecard entries by phase code via Project Express — typically 30–60 minutes per week, depending on project size. LPS receives the data and processes it immediately.

Designed to require minimal time from the field — without disrupting production.

03

Weekly Report Delivered

Your PM and ownership receive a labor performance report: budget vs. actual by phase code, end-of-job projection, flagged risks, and a weekly payroll report — ready to review in minutes, every week.

LPS supports your PM and foreman — it does not replace them.

Know Your Labor Position Every Week

We'll demonstrate DPC on a real self-perform project — your scope, your phase codes, your numbers.

All current LPS projects are on: OST/DPC v4.0.0.405  ·  Quick Bid v4.99.05.16
Next update communicated 1 week in advance · Updates are required per service agreement to maintain weekly DPC workflow
What We Offer

How LPS Engages Your Project

Every engagement starts with a structured setup, runs on weekly management for the life of the project, and includes a performance-aligned fee — so LPS is accountable to the same labor outcome you are. Fee structure, blended labor rate, and engagement terms are locked in writing at kickoff. No surprises mid-project.

LPS does not replace your PM, estimator, or foreman. We give them better data — every week.

LPS is best engaged before field labor begins — when estimate structure, phase codes, and reporting workflow can be aligned from day one.

⚙️
Core Engagement: Uses your existing OST & QB estimate. Add a DPC Foreman license per foreman per active project.

LPS holds PM licenses. Don't use OST/QB for estimating? Ask about our Estimate Conversion Service.

Core Engagement
Step 2
$2,000/month per project
Monthly DPC Management
The core ongoing service. LPS receives weekly foreman submissions, runs budget-vs-actual across every phase code, and delivers a labor performance report and timecard payroll report to ownership, PMs, and field leadership — every week, for the life of the project. Engagement terms are locked at project kickoff. First foreman setup is included in the initial engagement.
  • Weekly budget-vs-actual by phase code
  • Hours gained/lost — this week and cumulative
  • End-of-project labor projection at current pace — before it's locked in
  • Weekly timecard payroll report — tied to estimate phase codes so payroll entries are clean and traceable
  • High-risk phase codes flagged; top performers highlighted
  • Monthly executive summary to ownership and operations leadership
  • First foreman onboarding included — check-ins through the first month to confirm clean submissions
Step 3
5–10%
Performance-Aligned Fee
Negotiated at kickoff and contingent on results. The fee activates only when DPC-verified savings are documented against the original Quick Bid labor budget. No verified savings — no fee. This keeps LPS accountable to the same number you are.
  • Rate locked in writing before project start — tiered by project size (5%–10%)
  • Baseline and calculation method defined in writing at kickoff — original Quick Bid labor budget
  • Savings verified through DPC data at defined milestone reviews — never estimated
  • Aligns LPS performance directly with your labor outcome
Situational Services
Additional / Replacement
$1,000/person
Additional / Replacement Foreman Onboarding
The first foreman's onboarding is included at no extra charge when Monthly DPC Management is engaged. This service covers additional foremen on multi-foreman projects, or replacement foremen who join mid-project. $1,000 per person, virtual only.
  • DPC Foreman license setup and Project Express configuration on Windows laptop — one license per foreman; multiple licenses needed if running multiple projects simultaneously
  • Percent complete and timecard entry by phase code
  • Weekly submission process and timing expectations
  • Available mid-project when foreman changes occur
Estimate Conversion
Custom Quote
DPC Readiness & Estimate Conversion
For contractors who do not own On Center Software (OST + Quick Bid) but want to use LPS for ongoing DPC management. LPS obtains your existing estimate — Excel, Sage, Procore, or other format — plus project drawings, and recreates the estimate from scratch inside Quick Bid with proper phase codes, labor units, production rates, and soft cost conditions built in, structured specifically for DPC tracking and foreman entry. You receive a DPC-ready Quick Bid estimate ready for activation. Pricing is customized based on estimate complexity, drawing volume, and project scope.
  • Existing estimate obtained and rebuilt inside Quick Bid from scratch
  • Phase codes, labor units, and soft cost conditions configured for DPC
  • Once the OST & QB estimate is recreated on our end, you only need a DPC Foreman license and Windows field machine for each project — no OST or Quick Bid license required
  • Delivered ready for DPC activation — client may then engage LPS for ongoing management or manage independently
  • Pricing based on project scope — contact us for a detailed quote

Not Sure Where to Start?

Tell us your project scope and On Center setup. We'll tell you the fastest path to activation.

All current LPS projects are on: OST/DPC v4.0.0.405  ·  Quick Bid v4.99.05.16
Next update communicated 1 week in advance · Updates are required per service agreement to maintain weekly DPC workflow
The Process

From Estimate to Live
Labor Tracking in Days

LPS follows the On Center workflow exactly — OST takeoff, Quick Bid pricing, DPC activation, and weekly field submissions. Every step is managed by LPS from setup through closeout.

LPS supports your PM and foreman — it does not replace them.

📐 Powered by On Center Software's Digital Production Control (DPC)
1
On-Screen Takeoff®
Quantities measured from digital plans. Conditions set up with labor activities.
2
Quick Bid®
Estimate priced with labor cost codes. Hours assigned per activity using Interactive mode.
3
DPC Mode Activated
Labor data from OST + QB flows into Digital Production Control (DPC) for field tracking.
4
Project Express
Foreman submits weekly percent complete with timecard labor entries per budgeted phase codes from their Windows machine.
5
Weekly Reports
Budget vs. actual labor by phase code. Variances flagged. Strengths and high-risk activities identified.
Important: DPC Mode only activates when the OST bid was priced using Quick Bid Interactive mode with proper labor cost codes. If your estimate was not built this way, ask about our DPC Readiness & Estimate Conversion service before starting.
01

Estimate Review, DPC Compatibility Check & Accounting Alignment

LPS reviews your OST and Quick Bid estimate for DPC compatibility — proper labor cost codes and Interactive mode pricing are both required. We also align DPC phase codes with your accounting budget phase codes for all major labor items you track. If you are not currently tracking labor by phase code in accounting, we will consult new phase codes aligned with the estimate and provide a full phase code and description report — your accounting budget should be updated before kickoff. When DPC phase codes and accounting phase codes don't match, ownership ends up with two separate pictures of project health that never tell the same story. Getting this right before activation is the most important step in the entire setup.

02

Activate DPC Mode & Build the Tracker

LPS activates DPC on our PM license and builds the full tracking structure — phase codes, budgets, and weekly hour distributions. The package is pushed to your foreman via Project Express. Every labor line in Quick Bid becomes a live tracking phase code. No double entry, no manual re-keying.

03

Foreman Onboarding & First Submission

For Core Engagement clients, your estimating team already uses OST and QB — your foreman adds a DPC Foreman license on a Windows laptop. Running one project at a time, that's one license. Running multiple projects simultaneously, each foreman needs a license per active project. For Estimate Conversion clients, once LPS completes the estimate rebuild, your foreman only needs a DPC Foreman license and a Windows field machine per project — plan for additional lead time before activation. LPS conducts virtual training covering the bid package, percent complete by phase code, and accurate timecard entry. The first month includes regular check-ins to confirm clean submissions.

04

Foreman Submits Weekly Data — LPS Processes & Analyzes

Each week the foreman submits percent complete and timecard entries by phase code via Project Express — typically 30–60 minutes. LPS processes the data, runs budget-vs-actual across every phase code, and generates the weekly payroll report. When payroll is tied to DPC phase codes, untracked labor entries are eliminated and payroll reporting becomes a direct output of the tracking system.

05

Weekly Performance Report Delivered to Client

Your PM and ownership receive a labor performance report within 3–5 business days of payroll close — after the last hour is submitted, not before. The report covers budget vs. actual by phase code, cumulative variance, end-of-project projection, high-risk phase codes flagged, top performers noted, and the timecard payroll report. Structured for a quick read. The goal is a clear picture of where the job stands — not a data dump.

What You Receive Weekly

  • Budget-to-actual labor by every DPC phase code
  • Hours gained or lost this week and cumulative
  • End-of-project labor projection at current pace — before it's locked in
  • High-risk phase codes flagged for attention
  • Top performing phase codes highlighted
  • Weekly timecard payroll report

Timeline to Results

Core Engagement

Day 1Kickoff call + OST/QB estimate audit
Day 3–5DPC Mode activated on LPS PM license; tracker built
Week 1Foreman DPC license setup + first Project Express submission
Week 2First full variance report delivered to client
Week 3+Weekly cycle running — data confirmed, reports delivered

Estimate Conversion

Week 1–2Existing estimate obtained; rebuilt in Quick Bid from scratch
Week 2–3DPC activated; foreman DPC license setup + training
Week 3–4First Project Express submission + first report delivered

License Requirements

LPS holds: DPC Project Manager licenses — used to build, manage, and analyze all project tracking.

Core Engagement: Your existing OST & QB licenses are the foundation. You only need to add a DPC Foreman license on a Windows laptop per foreman. One project at a time — one license. Multiple simultaneous projects — one license per foreman per active project.

Estimate Conversion: Once LPS recreates your estimate in OST & QB on our end, you only need DPC Foreman licenses and Windows field machines — one per project. No OST or Quick Bid license required. Plan for additional setup lead time before activation begins. Licenses available from On Center Software (ConstructConnect®).

See DPC Applied to a Project Like Yours

We'll walk through DPC tracking using a project scope that matches your work type and On Center setup.

All current LPS projects are on: OST/DPC v4.0.0.405  ·  Quick Bid v4.99.05.16
Next update communicated 1 week in advance · Updates are required per service agreement to maintain weekly DPC workflow
What You'll Receive

Three Reports.
Every Week. Without Fail.

Every week LPS delivers three branded reports tied directly to your DPC phase codes. Here is what each one looks like and what it does for your operation.

Report 01
Weekly Labor Performance Report
Budget vs. actual by phase code, base bid position, week-over-week trend, phase code alerts, and projected savings. For PMs and field leadership.
Report 02
Weekly Payroll Recap
Every employee's hours by phase code and day — ready for payroll entry. Flags missing days, overtime, Saturday premium, and Sunday double-time.
Report 03
Weekly Executive Summary
Ownership-level snapshot: base bid position, projected savings, week-over-week trend, and one actionable flag. Built for a 60-second read.
01
Weekly Labor Performance Report
Budget vs. actual by phase code — delivered every week to ownership, PM, and field leadership
LPS
Labor Production Services
Weekly Labor Performance Report
Commercial Interior Project — Multi-Phase
Week Ending (WE)
Sample Report
Overall Completion
44%
5,943 of 14,200 est. hrs earned
Base Bid Position
+1,750 hrs
Ahead of budget on base bid
Projected at Close
+1,800 hrs
If current trend holds
Projected Savings
$149k
+1,776 hrs × $84.00 blended
Project tracking ahead of budget on active base bid assemblies.
Base bid position +1,750 hrs after adjusting for unbudgeted change events.
DPC work date: [WE Date]
Week-Over-Week — Base Bid Position
MetricPrior WeekCurrent WeekChange
% Complete43%44%▲ +1%
Base Bid Position+1,460+1,750▲ +290
Projected Final+1,820+1,800→ holding
Position improving. Base bid gained +290 hrs week-over-week. Projection holding — healthy signal at 44% complete.
Active Zone Performance — Sample Week
Zone% DoneEst. HrsPositionStatus
Zone A — Primary
Drywall, framing, doors, ceilings
85%
2,800+730Strong gain
Zones B/C — Phase 2
Ceiling grid, tile, framing
68%
1,390−195Over — flag
Zone G — Q4 Phase
Ceiling grid, tile, drywall
53%
570+98Monitor
+ 8 additional active zones tracked in full report
Phase Code Alerts — Items Requiring Attention
09.2140 — Ceiling Grid Assembly −14%
Zone B/C — 68% complete, trending 14% over budget. Review before next phase activates.
09.5100 — ACT Wall Molding −8%
Zones A and B/C — marginal negative trend. Early enough to monitor. Watch next two weeks.
06.1100 — Metal Stud Framing & 09.2080 — Drywall Hang
Both codes tracking ahead across all active zones. No action required.
Labor Production Services · Independent DPC Management · info@laborproductionservices.comSample · Confidential
02
Weekly Payroll Recap
Employee hours by phase code — ready for payroll entry, with overtime and premium time flags
LPS
Labor Production Services
Weekly Payroll Recap
Commercial Interior Project — Multi-Phase
Week Ending (WE)
Sample Report
Total Crew Hours
80:00
All employees this week
Base Bid Hours
69:00
Coded to estimate phase codes
Soft Cost Hours
3:00
Overhead — tracked separately
Change Event Hours
8:00
Non-estimated — pending CO
Timecard Detail — By Employee & Phase Code
Employee / Phase CodeMonTueWedThuFriTotal
10001 — Field Superintendent40:00
06.1100.00 — Roof Blocking
Zone A
2:003:004:007:0016:00
00.1001.00 — Change Event
Non-estimated — pending CO
8:008:00
10002 — Journeyman Carpenter40:00
09.2140.00 — Ceiling Grid
Zone B/C
4:008:008:0020:00
Project Totals — All Employees8:002:007:0012:0015:0080:00
Weekly Flags & Alerts
Change event hours (8:00) — 00.1001.00 logged Monday. Non-estimated, pending CO approval.
All employees at 40:00 — No missing days or incomplete weeks this period.

Saturday = premium time. Sunday = double time. DPC does not flag these automatically — LPS notes them in the weekly recap for your payroll team.

Labor Production Services · Independent DPC Management · info@laborproductionservices.comSample · Confidential
03
Weekly Executive Summary
Delivered to ownership every week — position, savings, trend, one flag. Built for a 60-second read.
LPS
Weekly Executive Summary
Week 18 of 42
Commercial Interior ProjectSample Report
Overall Completion
43%
11,783 of 27,400 est. hrs
Base Bid Position
+2,840 hrs
Ahead on active base bid work
Projected at Close
+3,120 hrs
If current pace holds
Projected Savings
$262k
+3,120 hrs × $84.00 blended
▲ Position gained +184 hrs this week
Prior: +2,656 hrs
Active Phase Codes
Drywall Hang — Low
+520
Drywall Hang — High
+288
Ceiling Grid
−126 △
This Week's Flag
Ceiling Grid (Zone B/C) trending 14% over at 68% complete. All other codes ahead. Overall +2,840 hrs. PM notified — monitoring before escalation.
Labor Production Services · Independent DPC ManagementSample · Confidential
Built for ownership. Position, savings, trend, one flag. Under 60 seconds. If nothing needs attention, they know in 30 seconds. If something does, it is flagged clearly.

See What Weekly DPC Reporting Looks Like

These reports represent what self-perform contractors receive every week — labor performance, payroll recap, trends, and alerts.

30-minute call. We will show DPC running on a self-perform project like yours.

All current LPS projects are on: OST/DPC v4.0.0.405  ·  Quick Bid v4.99.05.16
Next update communicated 1 week in advance · Updates are required per service agreement to maintain weekly DPC workflow

Most labor overruns we see are not caused by production — they come from lack of visibility. By the time they're discovered, they're already unrecoverable.

Best time to engage: Before field labor begins — when phase codes, estimate structure, and payroll reporting can be aligned from day one. Mid-project activation is possible but requires more setup work.

Transparent Pricing

Straightforward Fees.
Measurable Returns.

Fees are structured around your project. Setup is one-time and covers estimate audit, DPC activation, and foreman onboarding. Management is priced per project engagement — locked at kickoff for the life of the project. The performance fee only applies when savings are verified.

Labor Production Services — Fee Schedule
Project Setup & DPC Activation One-time per project. Includes estimate audit, DPC activation, phase-code configuration, Project Express delivery, and onboarding of the first foreman. Fee is tiered by project labor exposure: $1,500 for projects under $1.5M in labor — $2,500 for projects between $1.5M and $5M in labor — custom quote for projects over $5M in labor.
$1,500
/ $2,500 / Custom
Weekly DPC Management $500 per active payroll week — invoiced on the 1st of each month based on actual active weeks processed. Inactive weeks (zero payroll, no crew on site) are not billed. Terms locked in writing at project kickoff.
$500/active week
Performance-Aligned Fee Applied to DPC-verified labor savings only. Rate is tiered by project size — smaller projects carry a higher rate to account for fixed setup effort; larger projects earn a lower rate on a much larger savings pool. The baseline is your own QB estimate — authored by your team before LPS is engaged. Change orders, scope busts, and unbudgeted work are tracked separately and excluded from calculations. You are paying on real production discipline against your own numbers.
Project SizeLabor BudgetPerformance Fee
SmallUnder 6,000 hrs / under $500k10%
Mid6,000–15,000 hrs / $500k–$1.25M7.5%
Large15,000–25,000 hrs / $1.25M–$2M6%
Major25,000+ hrs / $2M+5%

Minimum applies: performance fee activates only on verified savings above $5,000. Rate locked in writing at project kickoff via Exhibit B.

Foreman Incentive: We incentivize your foreman's execution by sharing our performance fee savings with him — paid directly by LPS. You get labor recovery. He gets recognized for discipline. No guesswork. No office politics. DPC gives your foreman the same labor picture ownership sees — on well-estimated projects, that transparency gives the field breathing room to know exactly where they stand, every week.

5–10%of savings
Additional / Replacement Foreman Onboarding First foreman onboarding is included at no extra charge. This line applies only to additional foremen on multi-foreman projects or replacements who join mid-project. $1,000/person, virtual.
$1,000/person
DPC Readiness & Estimate Conversion For contractors who do not own On Center Software (OST + Quick Bid) but want to use LPS for ongoing DPC management. LPS obtains your existing estimate and recreates it from scratch inside Quick Bid with proper phase codes, labor units, production rates, and soft cost conditions — structured specifically for DPC tracking and foreman entry. Pricing is customized based on estimate complexity, drawing volume, and project scope. Contact us for a detailed quote before work begins.
Custom
Quote

Every LPS engagement is structured around your project — not a subscription. The first foreman is included. The performance fee only activates when savings are verified. You are not paying for software — you are paying for a managed weekly labor control system.

Engagement terms are locked at project kickoff. Fee structure, blended labor rate, and performance fee percentage are all documented in writing before DPC activation begins. Multi-project discounts available for 3+ simultaneous active projects.

Common Questions

Do we need On Center licenses?

For Core Engagement clients — yes, your estimating department already uses OST and Quick Bid. You only need to add a DPC Foreman license per foreman per active project. For Estimate Conversion clients — once LPS recreates your estimate on our end, you only need DPC Foreman licenses and Windows field machines. No OST or Quick Bid license required. LPS holds all PM licenses. Licenses available from On Center Software (ConstructConnect®).

What if our estimate isn't set up for DPC?

Most estimates are not. The OST/QB bid must be structured with Interactive mode and proper labor cost codes for DPC to activate. We audit the estimate as part of setup. If alignment is needed first, ask about our DPC Readiness & Estimate Conversion service.

How much time does this take from our team?

Typically 30–60 minutes per week from your foreman — percent complete and timecard entry by phase code via Project Express. LPS processes the data, runs the analysis, and delivers the report. That is your team's entire weekly commitment.

How is the performance fee calculated?

The rate is tiered by project size — 10% for projects under 6,000 hrs, 7.5% for 6,000–15,000 hrs, 6% for 15,000–25,000 hrs, and 5% for 25,000+ hrs. The rate and baseline are locked in writing at kickoff via Exhibit B. Savings are verified through DPC data — not estimated. The fee activates only on savings above $5,000. If DPC does not document savings, no fee is owed. A portion of the performance fee is shared directly with your foreman by LPS — rewarding field execution based on the same verified data.

How do we know savings aren't based on an inflated estimate?

The baseline is your own Quick Bid estimate — built by your estimating department before LPS is ever involved. LPS audits and configures that estimate for DPC tracking, but does not author it. We have no ability to inflate hours we didn't set. Beyond that, the performance fee calculation explicitly excludes change orders, scope busts, and unbudgeted work — all of which are tracked under separate phase codes. Hours recovered on work that was never in the original bid don't count. You're paying on real production discipline against your own numbers, not on hours that should never have been in the budget in the first place.

ROI Example — 10,000 Hour Project
Project labor budget10,000 hrs
Avg. hourly labor cost$85/hr
Total labor at risk$850,000
Illustrative efficiency gain8% (800 hrs)
Value of hours saved$68,000
Setup + 6 months management–$13,500
Performance-Aligned Fee (7.5% of savings)–$5,100
Net Return to Contractor$49,400

Illustrative estimate based on an 8% efficiency gain on a 10,000-hour project at $85/hr blended rate. Setup includes estimate audit, DPC activation, and first foreman onboarding — no additional onboarding fee for the first foreman. Results vary based on project type, estimate quality, crew performance, and tracking maturity. We provide realistic projections specific to your scope before any engagement begins.

On Center License Requirements

LPS holds DPC Project Manager licenses — no PM-level license purchase required on your end.

Clients need: OST and Quick Bid in your estimating department, plus a DPC Foreman license on a Windows machine for your foreman. Licenses are available from On Center Software (ConstructConnect®). If your estimate is not in OST/QB format, ask about DPC Readiness & Estimate Conversion.

Let's Build a Proposal for Your Project

Tell us your project size and On Center setup — we'll put together a specific fee and ROI projection.

All current LPS projects are on: OST/DPC v4.0.0.405  ·  Quick Bid v4.99.05.16
Next update communicated 1 week in advance · Updates are required per service agreement to maintain weekly DPC workflow
How The Numbers Work

What DPC Tracking
Is Worth on a Real Project

The math behind LPS is straightforward. Weekly phase code visibility surfaces labor variances early enough to act on them. Here is how that translates into dollar value across different project sizes.

These are illustrative models based on real DPC workflow patterns and industry labor cost data. They show how weekly tracking creates recoverable value — not guaranteed outcomes. LPS provides project-specific projections before any engagement begins.

The Core Problem

Most Contractors Find Out Too Late

The typical pattern: a PM realizes at 55–65% complete that labor is tracking over budget. With that much work done, recovery options are limited. The job finishes over budget, and the loss is written off as a production problem.

It usually is not a production problem. It is a visibility problem. The crew was drifting for weeks before anyone noticed — and by the time the signal appeared in billing, it was already unrecoverable.

The Blind Spot Most Contractors Don't Know They Have

Most contractors believe they are tracking production because timecards are coming in. Timecards track hours. DPC tracks production — percent complete by phase code against the estimate. These are not the same thing, and the difference is exactly where labor losses hide.

DPC surfaces that signal at Week 4, not at Month 4. That is the difference between a correctable variance and a locked-in loss.

Two Systems. One Story.

When DPC phase codes don't match accounting budget phase codes, ownership sees two completely different pictures of project health — one from DPC reports, one from accounting. Neither tells the full story. Both create confusion.

At setup, LPS aligns DPC phase codes with your accounting budget labor items. If your accounting budget doesn't yet track labor by phase code, we consult new phase codes and provide a full phase code and description report — so your accounting budget can be updated before the first labor entry hits. One system. One story. Every week.

The LPS Principle
Most projects recover the full cost of LPS with less than 1% labor efficiency improvement.
Without DPC vs. With DPC
Without Weekly Tracking
Week 1–4
Variance building — no signal visible
Week 8–12
Still no visibility — loss accumulating
Month 3+
PM sees it in billing — already unrecoverable
With Weekly DPC Tracking
Week 1–4
Phase code data building — baseline established
Week 4
Variance flagged — field team can still act
Week 6–8
Adjustment made — trend improving
Illustrative ROI Models

What Early Detection Is Worth
Across Project Sizes

Three project scales. Same methodology. The efficiency improvement required to recover the full cost of LPS shrinks as project size grows.

Illustrative Model A
Specialty Sub
4,000-hour drywall project
Labor budget4,000 hrs
Blended rate$85/hr
Total labor at risk$340,000
Illustrative gain (5%)200 hrs / $17,000
LPS fees (setup + 5 mo)$11,500
Illustrative net return$5,500
Break-even at 3.4% efficiency gain — less than one phase code improvement.
MOST COMMON
Illustrative Model B
Mid-Size GC
10,000-hour commercial interior
Labor budget10,000 hrs
Blended rate$85/hr
Total labor at risk$850,000
Illustrative gain (8%)800 hrs / $68,000
LPS fees (setup + 6 mo)$13,500
Illustrative net return$54,500
Break-even at 1.6% efficiency gain — typically one flagged phase code caught early.
Illustrative Model C
Large GC / Multi-Phase
25,000-hour healthcare renovation
Labor budget25,000 hrs
Blended rate$85/hr
Total labor at risk$2,125,000
Illustrative gain (6%)1,500 hrs / $127,500
LPS fees (setup + 12 mo)$25,500
Illustrative net return$102,000
Break-even at 0.6% efficiency gain — effectively one phase code running clean for one month.

Illustrative estimates only. Performance-aligned fee not included in net return calculations. Results vary based on project type, estimate quality, crew performance, and consistent weekly field submissions.

The Second ROI Stream

Labor Savings Are Only
Half the Story

Every hour your PM spends pulling timecards, reconciling phase codes, and building labor reports is an hour not spent on trade coordination, schedule management, or owner communication. LPS takes that function off the PM's plate entirely — and that time has a dollar value your labor budget never captures.

PM Time Recovered
5–8 hrs
per week, per active project

Weekly timecard collection, phase code reconciliation, variance analysis, and report building — removed from the PM's weekly workload.

Illustrative Annual Value
$18,000+
in recovered PM capacity per project

At a fully-loaded PM cost of ~$85/hr, 5 hours per week over a 6-month project is roughly $11,000 in recovered management capacity — before a single hour of labor savings is counted.

What That Capacity Is Worth
Trade Coord.
schedule, owner communication, RFIs

A PM focused on trade coordination and schedule management on a $10M project creates more value than a PM splitting time between coordination and weekly labor admin. LPS eliminates the split.

On a 6-month, 10,000-hour project: labor savings of $54,500 + approximately $11,000 in recovered PM capacity = $65,500 in combined illustrative return against a $13,500 LPS engagement cost.

PM capacity figures are illustrative. Actual hours recovered depend on existing reporting workload, project complexity, and PM compensation. LPS provides project-specific estimates before any engagement begins.

What DPC Actually Surfaces

The Variances That
Disappear Without Weekly Tracking

Phase Code Drift

A single phase code running 15% over budget in Week 4 is a conversation. The same code running 40% over in Week 12 is a loss. DPC flags it while you can still act.

Untracked Hours

Hours buried in general labor contaminate base bid performance. DPC separates soft costs, change events, and scope busts so production data stays clean and defensible.

Change Order Exposure

Unapproved change order hours coded to base bid phase codes distort every metric. DPC isolates them in real time — clean base bid data and a clear change order record simultaneously.

See What This Looks Like on Your Project

We will show you the DPC workflow on a project similar to yours — and give you a realistic projection before any engagement begins.

All current LPS projects are on: OST/DPC v4.0.0.405  ·  Quick Bid v4.99.05.16
Next update communicated 1 week in advance · Updates are required per service agreement to maintain weekly DPC workflow
About Labor Production Services

Built by Someone Who's
Lived the Problem in the Field

LPS was not built in a consulting firm. It came from 20+ years in the field — watching contractors lose labor margin they could have protected if they had seen it coming a few weeks earlier.

Our Story

20+ Years in the Field. One Clear Observation.

After 20+ years running self-perform labor on commercial projects, one pattern repeated: contractors owned On Center DPC, estimators used OST and Quick Bid, but DPC sat dormant — or was activated on a poorly structured estimate and produced data nobody trusted. The losses were consistent. A few percent over on one activity, a few hundred hours untracked on another. On $2M–$5M in annual self-perform labor, that adds up fast.

LPS was built to fix that: provide the dedicated operator On Center's DPC platform requires to run correctly — every week, on every active project.

Our experience comes from managing self-perform labor across commercial interiors, healthcare renovation, framing, drywall, and finish scopes — where estimate structure and field execution must stay aligned.

"

The best foremen I've worked with always knew whether they were ahead or behind — they felt it. We built a process that makes that instinct visible to everyone from the foreman to the owner, using a system they already paid for.

— Founder, Labor Production Services
Why We're Different

Deep On Center Software Experience

We've run DPC on active commercial projects, resolved OST/QB compatibility issues, trained foremen who had never used Project Express, and managed weekly reporting from setup through closeout — not in theory, in the field.

OST + Quick Bid Fluency

DPC accuracy depends entirely on how the OST takeoff and Quick Bid estimate are structured. We know exactly what a DPC-ready estimate requires — and how to build or fix one.

Performance-Aligned Fees

Part of our fee is contingent on DPC-verified savings. If your labor numbers do not improve, we do not earn that portion. That is not a sales line — it is how the engagement is structured.

No New Software to Buy

We work entirely within On Center's platform — OST, Quick Bid, and DPC. No proprietary dashboard, no data migration, no subscription layer on top. Just DPC running the way it was designed to.

What LPS does not do: LPS does not replace your PM, estimator, or foreman. We strengthen their visibility by managing the weekly DPC workflow and reporting structure — so your team leads with accurate data, not guesswork.

Independent Consultants. Labor Production Services is an independent consulting firm. We are not affiliated with, endorsed by, or employed by On Center Software or ConstructConnect®. Digital Production Control®, On-Screen Takeoff®, and Quick Bid® are registered trademarks of their respective owners.

Let's Talk About Your Operation

15 minutes is enough to know whether LPS is the right fit for your projects.

All current LPS projects are on: OST/DPC v4.0.0.405  ·  Quick Bid v4.99.05.16
Next update communicated 1 week in advance · Updates are required per service agreement to maintain weekly DPC workflow
Get Started

Tell Us About the Next Job
You Want Tracked

Fill out the form and we'll schedule a 30-minute call. We'll walk you through DPC on a project similar to yours — phase codes, weekly tracking, and what the reporting looks like in practice.

Self-Perform Labor Tracking. Let's Talk.

No commitment. No spam. A straight conversation about your labor.

You're On the Calendar

We'll reach out within one business day to confirm your demo time. We'll walk you through DPC on a self-perform project relevant to your trade and scale.

Or Book a Time Directly

Prefer to schedule now? Pick a time below. Available Monday through Thursday, 3:30pm to 4:30pm PT.

What Happens Next

01
We Review Your Submission We'll look at your project profile and On Center setup to prepare a relevant demo for your specific scope type.
02
30-Minute Demo Call We show DPC running on a project like yours — tracking, phase code variance, and weekly reporting in practice.
03
Custom Proposal If there is a fit, we send a project-specific proposal — scope, fees, timeline, and a realistic ROI estimate — within 48 hours.
04
Project Kickoff OST/QB audit and DPC setup: 3–5 business days. First weekly submission shortly after. Second week — first report delivered.

Our Commitment to You

  • No high-pressure sales
  • Straight assessment of whether your setup is DPC-ready
  • If you don't have the required licenses, we'll tell you exactly what to get
  • Realistic ROI expectations — specific to your project, before any agreement
  • If we're not the right fit, we'll tell you directly
Prefer Email?

Reach out at info@laborproductionservices.com — we respond within one business day.